Uploaded image for project: 'OpenOLAT'
  1. OpenOLAT
  2. OO-4093

Test: show estimated item time in test overview

    XMLWordPrintable

    Details

      Description

      When authoring tests it is difficult to see if the selected test items are accurate for the give time to take the test. E.g. when a test is scheduled to take 1h, it should not contain items that requires 2h of work. 

      The estimated time however is only an indicative metadata field. It is not required to be filled out, so it might be empty. 

      The labelling must be made in a way that it is not confused with a time constraint. We do not have time constraints on question item level, only on test level.

        Attachments

          Activity

            People

            Assignee:
            srosse Stéphane Rossé
            Reporter:
            gnaegi Florian Gnägi
            Tester:
            Mandy Menzel
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved:

                Time Tracking

                Estimated:
                Original Estimate - Not Specified
                Not Specified
                Remaining:
                Remaining Estimate - 0 minutes
                0m
                Logged:
                Time Spent - 10 minutes
                10m