Uploaded image for project: 'OpenOLAT'
  1. OpenOLAT
  2. OO-2897

Assessment: last modified date of participant

    XMLWordPrintable

    Details

      Description

      In the assessment tool the date last modified shows all changes which have been made. so it's not visible directly, when e.g. the user did a test

      --> dates should be more clarified

      3 types of date

      • technical changes
      • user changes
      • coach/owner changes

      by default date of user change is shown in

      • assessment tool
      • coaching tool
      • evidence of achievement

      date of course start should not be shown in assessment tool on every assessible course element but only on top root

      more details in document added (in German only)

        Attachments

          Activity

            People

            Assignee:
            srosse Stéphane Rossé
            Reporter:
            sscheiwiler Sabrina Scheiwiler (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved:

                Time Tracking

                Estimated:
                Original Estimate - Not Specified
                Not Specified
                Remaining:
                Remaining Estimate - 0 minutes
                0m
                Logged:
                Time Spent - 6 hours, 20 minutes
                6h 20m