Uploaded image for project: 'OpenOLAT'
  1. OpenOLAT
  2. OO-2725

QTI 2.1: Suspend workflow in test is improved

    XMLWordPrintable

    Details

      Description

      for suspending the test two scenarios are possible.

      • activate the suspend button in the options: a test participant can suspend the test by himself. If there is a time limit in the test, the time stops. the next time the test participant continues with the test, he continues right at the place where he left and the time continues where he left.
      • the computer crashes during a test: after the restart the test participant can continue where he left and all information is saved. if there is a time limit, the time keeps running during the downtime and the test participant continues with the actual time passed.

        Attachments

          Activity

            People

            Assignee:
            srosse Stéphane Rossé
            Reporter:
            sscheiwiler Sabrina Scheiwiler (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved:

                Time Tracking

                Estimated:
                Original Estimate - Not Specified
                Not Specified
                Remaining:
                Remaining Estimate - 0 minutes
                0m
                Logged:
                Time Spent - 45 minutes
                45m